Its a hobbit. Its quick to go fast. Future plans for this build include whitewalls and reinstalling the blinkers and battery pack. DIo 4-petal reeds, case work (opened flow-path and built up bottom of transfers), Plugged decomp. Stock Head cut to match Cyl. Cylinder Decked and Raised (ports open at BDC), oil holes added in piston, gasported piston, case matched, TrickMetric reed block.